The installation of aluminum radiator mainly includes the following steps:
 
1. ** Materials and tools ** :
- Ensure that the radiator model and specifications are in accordance with the design drawings, and the radiator surface should not be damaged, rusted or deformed.
- Prepare connection pipes and accessories such as aluminum-plastic pipes, joints, valves and brackets to ensure that these materials are of good quality and are not damaged.
- Prepare installation tools, such as an electric drill, screwdriver, pipe clamp, level, and wire brush.
 
2. ** Calibration installation position ** :
- Determine the installation position of the radiator according to the design drawings, and ensure that the radiator is kept at an appropriate distance from the wall or other household equipment.
- Use a level to check the levelness of the installation position to ensure that the heat sink is installed smoothly.
 
3. ** Mounting bracket ** :
- Install the support in the marked position to ensure that the support is firm and stable.
- Use screws and other fasteners to fix the bracket to the wall, ensuring that the bracket is tightly fitted to the wall.
 
4. ** Connecting pipes ** :
- Connect the radiator to the water supply and return pipe according to the design requirements.
- Use a special clamp to secure the pipe to ensure a strong connection and no leakage.
- Apply sealant to the pipe joints to ensure the sealing performance of the joints.
 
5. ** Install radiator ** :
- Place the radiator body on the installed support to ensure that the radiator is placed smoothly.
- Use screws and other fasteners to fix the radiator body together with the support to ensure that the radiator is firmly installed.
 
6. ** Adjust radiator level ** :
- Use a level to check the levelness of the heat sink.
- If it is found that the radiator is not installed horizontally, the height of the support or the position of the radiator body can be adjusted appropriately to meet the level requirements.
 
7. ** Quality inspection and safety precautions ** :
- Check that all installed parts are complete, intact, and free from damage and deformation.
- Check that the radiator is securely connected to the pipe and does not leak.
- Safety operation procedures shall be observed during installation to ensure the personal safety of construction personnel.
- Check the quality after installation to ensure that the installation quality meets the requirements and avoid safety hazards during use.
 
Please note that the installation method may vary depending on the radiator model, design requirements, and installation environment. Therefore, during the actual installation process, refer to the product manual and follow the advice of professional installers.